docs: capture risk methodology v0.3 (8 ? 5 dimensions) [OPE-16] #5
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "OPE-16-capture-risk-methodology-v0.3"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Ports the v0.3 methodology from the parallel repo where it was authored.
Collapses the original 8 evaluation dimensions to 5:
Also adds the inline reference-tag convention for the Capture Risk Assessment field (
[a],[d][n]etc. pointing to the row's References field).This doc governs how
captureRiskReasoningentries are authored in the data � it is the methodology input Zach is tracking on OPE-16. Unblocks that story from a methodology standpoint; the data-authoring pass (populating the field across protocols.json) is the remaining downstream work.Reviewed
View command line instructions
Checkout
From your project repository, check out a new branch and test the changes.Merge
Merge the changes and update on Forgejo.Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.